RecruitingBlogscom

Follow Us:

> Radley Corporation > Phase II Data Collection Implementation brings process improvements that save time and reduce stress
 

Phase II Data Collection Implementation brings process improvements that save time and reduce stress

Case Study Published By: Radley Corporation
Radley Corporation
Published:  Aug 30, 2010
Type:  Case Study
Length:  2 pages

In our previous paper (request Gemline Case Study Released 12/23/08) we told you about how Gemline eliminated a labor- and paper-intensive, disconnected system. By automating many data capture functions in both manufacturing and logistics they were able to do in one single scan what was previously for them a multi-step, labor intensive, and error prone process. They eliminated FIFO constraints and they gained the ability to issue more readily accessible on-site raw material to released production orders. Gemline recognized that in Radley's IFS/DC Automated Data Collection solution they had a stable, flexible, expandable and easy-to-learn/easy-to-use system with which they could move confidently into the future.



Tags : 
white paper, barcode data collection, ifs applications, shipping processes, radley corporation, automated data collection, erp integration, barcode labeling

© 2019  Created by RecruitingBlogs.   Powered by

Badges  |  Report an Issue  |  Terms of Service

scroll to the top